Engineering Probability Homework 11 due Thu 2019-04-25
All questions are from the text.
Each part of a question is worth 5 points, except for 8.101.
- 8.1 (a-e) p 471. You decide how to generate the random samples, perhaps with Matlab or Mathematica.
- 8.2 (a-e).
- 8.49 (a-b), p 478.
- 8.101, p 486. 10 points.
Total: 70 points.